The concept of paralleling construction activities is not a new idea, but the actual execution is usually less successful than the concepts lead you to believe. GE Johnson has developed an extremely successful method of utilizing BIM for exterior panelization; automating panel design, material ordering and fabrication. This process results in cost saving, time saving, improved quality control and safe working environment.


Project: St. Francis Medical Center, Colorado Springs
Owner: Centura Health
Architect: RTA Architects, Colorado Springs.

(SIG) 3D Revit Model of Architectural Panels. This model was the overall panel dimensional and spatial control for the project. The prefabrication process saved the owner approximately 2.5 million dollars on enclosure construction cost.


Project: St. Francis Medical Center, Colorado Springs
Owner: Centura Health
Architect: RTA Architects, Colorado Springs.

(SIG) field use fabrication drawings produced directly from the Revit framing models. This process consisted of direct order cut-to-length studs, marked material and complete dimensional layout.

'
Peak Vista
GE Johnson will build-out two School-Based Health Centers located at Falcon Elementary and Cresson Elementary.
'
'
Topping Out
The topping out in Parachute, CO for the Shea Garfield County Office Building took place May 3.
'